OSG202Xuất hiện trong 1 đề thi
Five batch jobs A through E arrive at a computer center at almost the same time. They have estimated running times of 8, 6, 2, 10, and 4 minutes. Their (externally determined) priorities are 3, 5, 2, 1, and 4 respectively, with 5 being the highest priority. Determine the average waiting time for Priority scheduling. Ignore process switching overhead.
Các lựa chọn
A10,8 minutes
B12,8 minutes
C16,8 minutes
D54 minutes