OSG202Xuất hiện trong 1 đề thi
Five batch jobs A through E, arrive at a computer center at almost the same time. They have estimated running times of 8, 6, 2, 10, and 4 minutes. Determine the average turnaround time for FCFS scheduling. Ignore process switching overhead.
Các lựa chọn
A17 minutes
B18 minutes
C18.8 minutes
D20 minutes