PMG201cXuất hiện trong 2 đề thi
Given 14,000 USD is the most likely of the estimated cost of the activity. 8,000 USD is the optimistic value and 26,000 USD is the pessimistic one. By using the PERT (Program Evaluation and Review Technique) analysis to calculate the expected activity cost, which of the following is the result?
Các lựa chọn
A16,000 USD
B12,000 USD
C15,000 USD
D21,000 USD